Db_22_dung_exterior_3_lower_full

Dungeness A Power Station Electrical Overlay Scheme

Location: Cumbria, England
Client: British Nuclear Fuels plc
Value: £33,000,000
Construction Period: 52 Months
Year Completed: 1993

Enabling works associated with new electrical distribution system for Dungeness ‘A’ Power Station.

The scope of work includes detailed design, installation of a free issue transformer, switchboard and package substations, civil construction of necessary foundations for new equipment, installation of cable tray and associated steelworks and supply of 6.6kV cables.